Tolerance SRO-S-021-23072009 for construction and installation works
With the third level of responsibility up to 3 000 000 000 rubles.
Tolerance SRO-P-024-14092009 for design and survey works
With the right to prepare design documentation in relation to especially dangerous, technically complex and unique capital construction projects with the first level of responsibility up to RUB 50,000,000
Tolerance SRO-I-025-28012010 for survey
and other types of control
In 2022, the Siberian Department of the Federal Service for Environmental, Technological and Nuclear Supervision registered its own ELECTROLABORATORY TOBOL LLC with the right to perform tests up to 10 kV
For more information,